In Algeria, decennial liability and contractors' all risks insurance protect a building or civil works project at two separate moments: during construction, against accidental damage, and after handover, against serious defects for ten years. They concern developers, contractors, architects, engineering offices, technical controllers and project owners, public or private. Premiums are calculated in Algerian dinars (DZD) on the contract value and the nature of the works, with insurers licensed in Algeria. Banks and public clients routinely ask to see both certificates before a project starts.
Two insurances for two phases of the same structure
A construction site goes through two risk periods. During the works, a collapsed formwork, a flooded plot, a fire or stolen materials can wreck the economics of the project. That is the domain of contractors' all risks cover, known as CAR. After delivery, structural defects can appear years later: through cracks, sinking foundations or serious water ingress. Decennial liability answers those disorders and protects both the buyer and the user.
The two covers do not replace each other. A developer who buys only the decennial policy is exposed throughout the works, while a contractor holding only CAR leaves the period after delivery unprotected, which is often the longest and costliest. Banks financing a housing programme usually ask for both certificates before releasing funds.
Decennial liability: the responsibility of builders
The Algerian Civil Code makes architects and contractors answerable for ten years for total or partial collapse and for defects that endanger the solidity of the structure or its fitness for use. Insurance legislation requires construction professionals to insure this liability. The contract turns a potentially huge debt into an annual or single premium calculated on the cost of the works.
Who must insure
- The contractor and subcontractors in charge of work packages.
- The architect and the technical engineering office.
- The property developer selling housing units.
- The technical control body for its mission.
The ten years start at the handover, recorded in a signed report. That date has to be formalised and the document kept. Normal wear and lack of upkeep are not covered.
Contractors' all risks insurance: what it guarantees
CAR protects the structure under construction, stored materials, temporary installations and sometimes site equipment. It responds to sudden accidental events such as fire, explosion, storm, landslide, theft, design error or faulty execution, depending on the extension selected. Project owners require it in their specifications.
It usually has two parts. The first covers damage to the works themselves as they progress. The second covers the site's liability to third parties: neighbours and passers-by whose property can be damaged by vibrations, a falling object or a ground subsidence. Earthwork and foundations, the most sensitive stages, receive special attention.
Sum insured, duration and premium
The insured value matches the total cost of the project, works and supplies included. The duration follows the planned schedule, with a maintenance period after handover. The premium depends on the type of structure, seismic zone, technical complexity, the experience of the company and the deductible.
Algeria is exposed to earthquakes, and several northern regions impose seismic rules that the insurer checks. A site in a dense urban area next to existing buildings is riskier than an isolated one. Any delay must be reported to extend the cover, otherwise the insurer may refuse to pay beyond the planned date.
Documents and steps to take out the policy
The file includes the contract or tender award, drawings, soil study, schedule, list of participants, technical controller's report and a description of construction methods. The insurer may visit the site, ask for safety measures and set special conditions for deep foundations or exposed locations. A certificate is given to the project owner before work begins.
Claims on site: first steps and expert review
After an event, the site manager secures the area, informs the insurer immediately and preserves damaged items. Photographs, site reports, the works diary and witness statements feed the expert's work. Decennial disorders need a longer technical investigation, because severity and the link to the construction must be established.
Technical control plays a central role. A site without serious control, with uncertified materials or no soil study, may see its cover challenged or surcharged. Keeping inspection reports, delivery notes and handover minutes is the best protection in a dispute.
Exclusions and points of caution
Commonly excluded are intentional fault, normal wear, late-completion penalties, purely aesthetic damage and non-evolving defects. Bridges, atypical buildings and works in seismic areas need a specific wording. Comparing offers on exclusions, deductibles and limits prevents unpleasant surprises when a loss occurs.
Advice for developers and project owners
A public or private owner should demand insurance certificates from bidders as soon as the tender is issued, stating the activities covered and the amounts guaranteed. A generic certificate is not enough: it has to refer to the site concerned, its dates and its scope.
For buyers of off-plan housing, a valid policy is reassuring and carries weight in talks with the bank. Keeping the whole file, from building permit to execution drawings and maintenance notices, helps prove the origin and date of the works later.
Frequently asked questions
Is decennial insurance compulsory in Algeria?
Yes, construction professionals are required by insurance legislation to cover their ten-year liability. Project owners and banks check the certificate before work starts or funds are released.
What is the difference between decennial cover and CAR?
CAR covers accidental damage while the building is being built. Decennial cover starts after handover and addresses serious defects over ten years. A project normally needs both.
Must a subcontractor hold its own insurance?
Usually yes. Subcontractors in charge of a work package are liable for their part, so they should hold their own certificate or be named clearly under the main contractor's policy.
What happens if the site overruns the planned duration?
The insurer must be told so that the policy can be extended. Without an extension, damage after the stated end date may be refused, even if the works are still in progress.
Further reading
- CASH Assurances : Algerian insurer whose English page presents cover for major risks and offers for professionals.