Morocco: decennial liability and contractors' all risks insurance

Morocco decennial liability contractors all risks insurance : an adviser presents an insurance contract to an older couple seated in a living room

Morocco protects building projects through decennial liability and contractors' all risks insurance, two covers that work at different moments. The all risks policy, known as CAR, pays for accidental physical damage during works, such as fire, collapse, theft or storm. Decennial cover applies after handover, when serious defects threaten the solidity of the structure within the ten-year liability period written into the Dahir of Obligations and Contracts. Developers, builders, architects and project owners buy both from licensed insurers to safeguard their investments, in dirhams (MAD).

Ten-year liability in Moroccan law

The Dahir of Obligations and Contracts makes architects and builders answerable for ten years from handover when a construction defect endangers the stability of the work or makes it unfit for its purpose.

The rule is aimed at major works such as apartment blocks, roads and bridges, while lighter components carry shorter guarantees. The liability reaches the company's own assets, so insurance is the usual way to fund it.

A project involves many parties: owner, architect, design office, main contractor, subcontractors and inspection body. Each carries a share of responsibility, which explains the number of separate policies.

Contractors' all risks cover during works

The all risks policy insures accidental damage to the works under construction, to materials and to site installations, whatever the cause, unless excluded. It usually responds to fire, explosion, water damage, collapse, design or workmanship errors under some wordings, and theft under set conditions.

It is normally bought by the owner or the main contractor for the benefit of everyone on site. The sum insured should reflect the full cost of the project, including materials, labour and fees.

Rain, stolen materials, handling errors and collapses are the everyday threats, and cover lasts until the works are formally received. Most policies also require the insured to keep safety rules, secure the site at night and report any change in the building method.

Extensions that can be added

A CAR contract can be extended to third-party liability on site, a maintenance period after completion, debris removal, damage to existing property or loss of anticipated income caused by delay.

Each extension has its own price and limit. Large schemes such as shopping centres or infrastructure combine several to secure the chain of contracts.

Urban public works may also add damage to neighbouring buildings and buried networks. The soil survey, the nature of the ground and any nearby watercourse strongly shape the insurer's view of the risk.

What decennial insurance pays for

The policy funds repairs of defects that affect the solidity or the purpose of the building, such as structural cracks, serious waterproofing failures or subsidence. It is bought by builders, architects and design offices to cover their own liability.

Cover depends on the limits in the contract and on an accurate declaration of the activities and turnover of the insured.

The notion of the work extends to foundations, structure and inseparable fittings. Court action must respect precise time limits that every professional should know.

Who must insure and when

The owner generally buys the CAR policy, while each firm keeps its own professional and decennial liability cover. Public and private tender documents often state which insurance certificates are needed before the site opens.

It is wise to study the construction contract to see who insures what, and to coordinate policies so that no gap appears.

A handover without reservations starts the long guarantees, so every remark should be recorded in writing when the keys are given. A detailed handover report signed by all parties avoids endless arguments about the condition of the work.

Premium, excess and pricing factors

The price depends on the type and total cost of the work, its duration, the location, the building method, the subcontractors and the seismic or flood exposure of the area. Excesses vary by cover.

A contractor with strong references, a quality system and rigorous technical supervision usually obtains better terms.

Performance bonds and financial guarantees issued by a bank are different from insurance and do not replace it. Natural hazards such as flooding may be added by extension, which is worth examining in sensitive areas. Compare quotes on the same limits, excesses and exclusions, because the cheapest offer often hides narrower wording.

Loss on site or defect after handover

During works, report the loss quickly, secure the site, keep the damaged items and let the expert record the damage. After handover, the owner sends a claim to the builder, who informs the insurer.

Time limits and the quality of execution records decide the outcome of a claim.

Builders keep an as-built file with plans, calculation notes, material certificates and site minutes, which serves as proof if a defect appears. Subcontractors should show their insurance certificates before entering the site.

Preparing a construction insurance programme

For a sizeable project, a specialist broker will assess risks, coordinate the policies and negotiate limits. Insurers study the plans, the schedule and the qualifications of the participants before quoting.

Small private house projects also benefit from deciding which minimum covers to arrange.

Property developers, who face particular duties towards buyers, often build a fuller programme. A technical inspection body can help check compliance and prevent disputes.

Frequently asked questions

Is the CAR policy compulsory in Morocco?

It is not a general legal requirement, but lenders, public clients and developers commonly insist on it before works begin.

When does decennial liability start?

It runs from the date of handover. A detailed handover report and a clear record of reservations help fix that starting point.

Who buys the all risks policy?

Usually the project owner or the main contractor, naming every participant as an insured party so that one contract covers the whole site.

Does the policy pay for the cost of correcting poor work?

Often not. Many wordings exclude the cost of redoing faulty workmanship and pay only for the resulting damage, so read the exclusions carefully.